The City has been divided into 7 zones for the purpose of distribution of drinking water, including town of Manimajra.  The total installed capacity of drinking water from the four phases of surface source is about 67 MGD. Apart from the piped supply, about 20 MGD is also abstracted through deep bore wells with power pumps. Out of the total 156730 water connections, more than 94% connections are metered and flat rate connections are given to rehabilitated colonies.  Besides there are 800 stand posts in the city 332 LPCD water is 10-12 hours.


Source: MC, Chandigarh